WORK CYCLE PHASES

    The main phases of the work cycle are: a. Boiling: this operation must take place with spring water in special boilers for a period of not less than 60 minutes. Immediately after boiling, the cork must be stacked in well-ventilated rooms and moved to the next processing within 15-20 days. b. Classification by caliber and quality of the planks and their cutting into strips. c. Punching: the diameter of the cork stopper must be as close as possible to the thickness of the source planks. Consequently, on the heads of the cork stopper, 6-7 complete annual rings should be visible if the plank is 9 years old, 7-8 if it is 10 years old, and so on. d. Heading: the punched cork stopper is rectified at the bases with a machine called a heading machine. e. Dedusting: removal of the red dust contained in the lenticular cavities using rotary machines equipped with aspirators. f. Washing and drying: the cork stoppers must be treated with spring water, followed by a second wash with a diluted solution of 2-3% citric acid. Immediately after, they are dried to bring the moisture content below 10%. g. Classification of cork stoppers: this can be done using the traditional subjective method or the objective electronic method. h. Marking and sterilization: marking must be done by fire only on the lateral surface of the cylinder. Each cork must contain an acronym for recognition and the packaging date. Use must be within 6 months. i. Lubrication: solid, semi-solid, or liquid lubricants may be used. If lubrication is done with paraffin, its melting point cannot be lower than 52-54 °C. l. Packaging and shipping: packaging must be done immediately after the end of the work cycle in cellophane bags enclosed in cardboard containers.
    WORK CYCLE PHASES - Cork from A to Z | d'Araprì