WORK CYCLE PHASES
The main phases of the work cycle are:
a. Boiling: this operation must take place with spring water in special boilers for a period of not less than 60 minutes. Immediately after boiling, the cork must be stacked in well-ventilated rooms and moved to the next processing within 15-20 days.
b. Classification by caliber and quality of the planks and their cutting into strips.
c. Punching: the diameter of the cork stopper must be as close as possible to the thickness of the source planks. Consequently, on the heads of the cork stopper, 6-7 complete annual rings should be visible if the plank is 9 years old, 7-8 if it is 10 years old, and so on.
d. Heading: the punched cork stopper is rectified at the bases with a machine called a heading machine.
e. Dedusting: removal of the red dust contained in the lenticular cavities using rotary machines equipped with aspirators.
f. Washing and drying: the cork stoppers must be treated with spring water, followed by a second wash with a diluted solution of 2-3% citric acid. Immediately after, they are dried to bring the moisture content below 10%.
g. Classification of cork stoppers: this can be done using the traditional subjective method or the objective electronic method.
h. Marking and sterilization: marking must be done by fire only on the lateral surface of the cylinder. Each cork must contain an acronym for recognition and the packaging date. Use must be within 6 months.
i. Lubrication: solid, semi-solid, or liquid lubricants may be used. If lubrication is done with paraffin, its melting point cannot be lower than 52-54 °C.
l. Packaging and shipping: packaging must be done immediately after the end of the work cycle in cellophane bags enclosed in cardboard containers.